primary care and well being centre, saltley, birmingham

Birmingham and Solihull "LIFT"

This £8.5 million development was undertaken by Mansell as a Design and Build Contract.  Nicol Thomas was appointed by Mansell at tender stage to lead a design review of the design and to engineer cost savings.  This resulted in both an improved scheme and reduced costs of over 10% assisting Mansell's successful bid for the project.

The facilities include 20 Consulting Rooms plus Treatment and Therapy Rooms, a Physiotherapy Department, Pharmacy, X-Ray and ECG facilities and a Phlebotomy Laboratory.

The scheme interior is vibrant and colourful with an atrium space over the Waiting Area.  It provides a first class facility for the staff and patients.

The design incorporates Geothermal technology which has contributed towards the rating of BREEAM 'Excellent'.

key facts

  • £8.5 million development providing 20 Consulting Rooms
  • Vibrant and colourful interior with atrium above waiting area
  • Incorporating geothermal technology that contributed towards a BREEAM rating of 'Excellent'